Thursday, April 17, 2014

PCI

PCI was today and it went really smoothly!

Met up with our new SS Shane who was absolutely lovely. He ran through the paperwork first (warranties, care guides etc.) and then we went for a look through the house.

Fortunately only the following will be required:
- Door handles to wardrobes
- Repair of water meter to front of house (neighbour's builders have runover the entire thing, flattened it into the ground and now it has been leaking water everywhere, wahhh)
- Repair of sewer pipe at rear of house (neighbour's builder have also managed to run over this)
- Replacement of glass stacker door in great room (glass panes were replaced after it fell down however the metal has scuff marks all over it)

We are due to get keys on Thursday (24/04/2014) which fits in perfectly with our floor installation (scheduled for Monday 28/04/2014).

Shane also gave us our McDonald Jones gift which contains towels, soap, soap dispenser and a toilet brush ...all in white :)


Also got this to fill in........no idea what we're going to do!