Our bamboo floor was installed today through Harvey Norman - the colour is Red Strand. Our layer Spiro did a fantastic job and I would highly recommend him if you're in the Sydney area.
Apologies for the mess as the floor needs a good clean - I don't happen to own a mop or broom yet!
We need to install the skirting ourselves which I am absolutely dreading, ughh :(
Really pleased with how the floor has turned out and it's amazing how much of a difference it makes to the feel of the house. Feels much more like a home rather than a construction site
Monday, April 28, 2014
Sunday, April 27, 2014
Keys
On Thursday 24th April 2014 we officially got our keys
Bamboo is being laid tomorrow and then carpet on Thursday. Appliances from MJH are arriving Tuesday and installed Wednesday. Whitegoods from Good Guys will be arriving Thursday.
Cannot wait to assemble all our IKEA furniture (i LOVE flat pack stuff) and have my fingers crossed that our Freedom lounges will arrive in the next couple of weeks.
Shade Elegance are coming in sometime this week to measure up our plantation shutters.
Can't believe our house journey is pretty much over. We have had a truly amazing experience with MJH and are very pleased with the house they have delivered.
Bamboo is being laid tomorrow and then carpet on Thursday. Appliances from MJH are arriving Tuesday and installed Wednesday. Whitegoods from Good Guys will be arriving Thursday.
Cannot wait to assemble all our IKEA furniture (i LOVE flat pack stuff) and have my fingers crossed that our Freedom lounges will arrive in the next couple of weeks.
Shade Elegance are coming in sometime this week to measure up our plantation shutters.
Can't believe our house journey is pretty much over. We have had a truly amazing experience with MJH and are very pleased with the house they have delivered.
Thursday, April 17, 2014
PCI
PCI was today and it went really smoothly!
Met up with our new SS Shane who was absolutely lovely. He ran through the paperwork first (warranties, care guides etc.) and then we went for a look through the house.
Fortunately only the following will be required:
- Door handles to wardrobes
- Repair of water meter to front of house (neighbour's builders have runover the entire thing, flattened it into the ground and now it has been leaking water everywhere, wahhh)
- Repair of sewer pipe at rear of house (neighbour's builder have also managed to run over this)
- Replacement of glass stacker door in great room (glass panes were replaced after it fell down however the metal has scuff marks all over it)
We are due to get keys on Thursday (24/04/2014) which fits in perfectly with our floor installation (scheduled for Monday 28/04/2014).
Shane also gave us our McDonald Jones gift which contains towels, soap, soap dispenser and a toilet brush ...all in white :)
Also got this to fill in........no idea what we're going to do!
Met up with our new SS Shane who was absolutely lovely. He ran through the paperwork first (warranties, care guides etc.) and then we went for a look through the house.
Fortunately only the following will be required:
- Door handles to wardrobes
- Repair of water meter to front of house (neighbour's builders have runover the entire thing, flattened it into the ground and now it has been leaking water everywhere, wahhh)
- Repair of sewer pipe at rear of house (neighbour's builder have also managed to run over this)
- Replacement of glass stacker door in great room (glass panes were replaced after it fell down however the metal has scuff marks all over it)
We are due to get keys on Thursday (24/04/2014) which fits in perfectly with our floor installation (scheduled for Monday 28/04/2014).
Shane also gave us our McDonald Jones gift which contains towels, soap, soap dispenser and a toilet brush ...all in white :)
Also got this to fill in........no idea what we're going to do!
Monday, April 14, 2014
Small Update
Not much happening these days as we draw closer to handover. PCI was initially planned for tomorrow (15 April) however we still haven't heard anything from our new SS. Really hoping it happens this week so we can still look at getting keys this month. I'm wary of handover dates given all the public holidays in April. Flooring is tentatively booked for 28th April but I think we may need to push this back
Painter was back today doing touch ups and finally got to go inside the house. I've been peeking through the windows and noticed blue tape everywhere, however today all the tape was gone so I think the gyprocker etc. had been in also
Something odd that I noticed - none of our wardrobe doors have handles? Every other handle in the house has been installed but nothing for our wardrobes.
Towel racks and toilet roll holders are in at least :D
Last few weekends have been spent researching appliances - I think we may have two big purchases sorted!
Painter was back today doing touch ups and finally got to go inside the house. I've been peeking through the windows and noticed blue tape everywhere, however today all the tape was gone so I think the gyprocker etc. had been in also
Something odd that I noticed - none of our wardrobe doors have handles? Every other handle in the house has been installed but nothing for our wardrobes.
Towel racks and toilet roll holders are in at least :D
Towel racks, yay
Last few weekends have been spent researching appliances - I think we may have two big purchases sorted!
Tuesday, April 8, 2014
Security Fence Removed
No exact dates yet for handover as yet. There have been whispers of April 15 for PCI but nothing set in concrete.
Wednesday, April 2, 2014
House Cleaned
Cleaners were in today and have removed the plastic film from all windows and stacker doors, mopped the bathrooms and tidied up our kitchen
Managed to get a proper look at our splashback and it looks good, although I'll admit it wasn't quite what I was expecting. We had intended on getting something grey to match in with our cabinets, however in some lights the colour looks almost olive (and i suspect this is due to the natural tint in the glass itself).
That said, I think it'll come together better once appliances and flooring are installed
Managed to get a proper look at our splashback and it looks good, although I'll admit it wasn't quite what I was expecting. We had intended on getting something grey to match in with our cabinets, however in some lights the colour looks almost olive (and i suspect this is due to the natural tint in the glass itself).
That said, I think it'll come together better once appliances and flooring are installed
Mmmm clean stacker doors
Splashback - happy with it although it is much more green/brown than our cabinets :(
Our lovely island benchtop without the covers - Caesarstone Ice Snow
Colours dont match, boooo
This picture probably reflects the splashback colour the best - looks greyish on it's own but then looks olive next to our cabinets
Love our big sink
AC return in hallway
Clean windows, ahhh
Tuesday, April 1, 2014
Splashback Installed
The big day finally arrived and I am aware that the photo below is quite possibly the worst I've ever taken. We are well and truly locked out so I had to resort to a blurry pic through our stacker doors. I'm excited to see our splashback in different lighting as the entire kitchen was orange today in the afternoon sun.
I will update this post later with better pics of the splashback once I can get inside :)
I will update this post later with better pics of the splashback once I can get inside :)
Splashback in 'Heirloom'- cupboards look a bit funny here as the black covers that were over our Caesarstone benchtops have been flipped over during the splashback installation.
I think this will look very different with appliances and no black covers over our Ice Snow benchtops
I think this will look very different with appliances and no black covers over our Ice Snow benchtops
Subscribe to:
Posts (Atom)





