Wednesday, February 19, 2014

Doors, Architraves & Skirting

Today's mission was getting into the house through Bedroom 3 as more waterproofing was put around the bath area. And again I was wearing a skirt and again I regretted the decision.

Not only was there waterproofing but little frames have been installed around the wet area for the shower screens and tiles.

The guy who installs the architraves/doors/skirting got a whole lot of work done today, completing almost everything except for a door or two and some skirting. He anticipates it'll all be finished tomorrow and then it's onto the next job - no idea what that is though. Perhaps door handles or kitchen cupboards?


Cavity sliding door for our ensuite 

 

Wardrobe in Bedroom 2


Skirting in home theatre - reaaalllly not looking forward to doing this ourselves in the main living area





Tuesday, February 18, 2014

Lock Up

And just like that, we were locked out of our house.

And by locked out, I mean today was the first time I had to climb through the bathroom window (in a pencil skirt) to get into our build.

For those who are wondering - our doors have been key locked so we can't just undo the latch. I may have strategically opened some windows for future access ;-)

Front door is on and looking good, although I wish we could have had the 1200m size (doesn't fit in the Avoca). I think our frame may need to get replaced though as it has been left out in the rain and is pretty warped. As you can see in the photo below there are some significant gaps either side of the frame but not sure whether this will be covered by a trim?

Internal doors and architraves have been delivered and must be getting installed this week.

Anxiously awaiting a kitchen cupboard delivery!















Monday, February 17, 2014

Garage Door & Waterproofing

Productive start to the week!

Our beautiful Caoba door was installed today and is looking stunning.



Waterproofing was completed in our wet areas (wow the smell of that stuff is lethal haha) and our fancy trilock handle for the front door was delivered.


Installation of kitchen cupboards and doors all happening this week with wet area tiling scheduled for next Thursday (27/2)

Tried to suss out handover dates, one because I'm nosy but also so we can arrange flooring through Harvey Norman. Mark told us we should be in by late April however I'm hoping he is being overly cautious with dates and that we'll be in earlier in the month.


Saturday, February 15, 2014

Cornices & Flooring Choices

Not much progress this week however I suppose this is to be expected now that work has moved inside. Everyone keeps mentioning that this is where things slow down and I'm not really sure what is next on the agenda for our build.

Cornices were completed this week and are looking very nice. We went for the standard cornice as we dont like anything too fussy.



Dropped into Harvey Norman last week who will be doing our flooring after handover. We will be getting bamboo through the main living areas and then carpet through the bedrooms/hallway/home theatre



Now I'm just sitting and waiting for more works to commence and hopefully we'll have an idea of handover shortly. We were initially told mid May but I'm hoping we'll be in by April

Thursday, February 6, 2014

Internal Work Begins

What a productive week!



On Monday our gyprock & cornices were delivered and insulation started



So much gyprock






Insulation





Gyprock has been put up through the whole house and is looking good so far. I understand now when people say that gyprock turns the house into a maze - I have been so used to seeing from one side of the house to another through the walls.



I have been very nervous about gyprock making the house seem smaller but it has been the opposite - the ceiling now seems exceptionally tall and the rooms sizes are what i envisioned or bigger.



Again, I echo my earlier statements about being glad we never opted for a polished concrete floor. The floor is MESSY and there are already chips out of the slab from where tools have been dropped.



Gyprock everywhere





Garage




Entry



Kitchen - fridge space and WIP (with 'heatproof' red gyprock)







Great room - TV recess






Home theatre - 'soundproof' yellow gyprock
 



Hallway to main bedrooms - we have raised the ceiling height but kept door height standard (still wonder if we should have changed this)





 Great room looking towards hallway to main bedrooms






A door for ants i.e. the door for our toilet (ensuite) prior to the top sheet of gyprock being trimmed







Thursday, January 30, 2014

Progress Update

Looks like we've got some busy weeks ahead of us!

Electrical rough in was completed this week and our bricks are being cleaned today.

Insulation will be going in Monday with gyprock hopefully starting on Tuesday. Our SS Mark advised we'll probably be locked out in a 2-3 weeks :-(

We continue to have no luck with our glass stacker door - this time a panel has fallen out and shattered everywhere, ughhh. Mark is all over it though and we'll have a shiny new door installed shortly.

Clean bricks, ahhhhh





Saturday, January 25, 2014

Timber Beams Installed

So. damn. pretty.

I think they'll look ever better once they're stained and the front door/garage door are installed