Friday, February 28, 2014
Thursday, February 27, 2014
Screeding
Now we have a lovely flat surface for our tiles to go onto
Floor tiles going in tomorrow, wall tiles Saturday
Floor tiles going in tomorrow, wall tiles Saturday
Tuesday, February 25, 2014
Kitchen Cupboards Installed & Tile Delivery
Thanks again to the nice tradesman who let my dad in go take photos!
Very pleased with how they look. Had no idea the kitchen island had cupboards in both sides - yay for surprise storage
Very pleased with how they look. Had no idea the kitchen island had cupboards in both sides - yay for surprise storage
Monday, February 24, 2014
Cupboards Delivered
Due to be installed tomorrow :-)
Delivery guy kindly let my father in to take some photos - kitchen overheads are glossy white with no handles (Polytec Createc in Ultra White), kitchen island/everything else are a mid toned grey with silver handles placed horizontally (Polytec Strata Grey)
No good pictures of the bathroom cupboards, however they are a very light grey which looks almost white (Polytec Amaro). Feeling very uncertain about the bathroom cupboard selection and wishing I had gone for something darker like Polytec Cavia Lini :-(
Also got a laundry tub delivered, how exciting haha
Delivery guy kindly let my father in to take some photos - kitchen overheads are glossy white with no handles (Polytec Createc in Ultra White), kitchen island/everything else are a mid toned grey with silver handles placed horizontally (Polytec Strata Grey)
No good pictures of the bathroom cupboards, however they are a very light grey which looks almost white (Polytec Amaro). Feeling very uncertain about the bathroom cupboard selection and wishing I had gone for something darker like Polytec Cavia Lini :-(
Also got a laundry tub delivered, how exciting haha
Thursday, February 20, 2014
Wednesday, February 19, 2014
Doors, Architraves & Skirting
Today's mission was getting into the house through Bedroom 3 as more waterproofing was put around the bath area. And again I was wearing a skirt and again I regretted the decision.
Not only was there waterproofing but little frames have been installed around the wet area for the shower screens and tiles.
The guy who installs the architraves/doors/skirting got a whole lot of work done today, completing almost everything except for a door or two and some skirting. He anticipates it'll all be finished tomorrow and then it's onto the next job - no idea what that is though. Perhaps door handles or kitchen cupboards?
Not only was there waterproofing but little frames have been installed around the wet area for the shower screens and tiles.
The guy who installs the architraves/doors/skirting got a whole lot of work done today, completing almost everything except for a door or two and some skirting. He anticipates it'll all be finished tomorrow and then it's onto the next job - no idea what that is though. Perhaps door handles or kitchen cupboards?
Cavity sliding door for our ensuite
Wardrobe in Bedroom 2
Skirting in home theatre - reaaalllly not looking forward to doing this ourselves in the main living area
Tuesday, February 18, 2014
Lock Up
And just like that, we were locked out of our house.
And by locked out, I mean today was the first time I had to climb through the bathroom window (in a pencil skirt) to get into our build.
For those who are wondering - our doors have been key locked so we can't just undo the latch. I may have strategically opened some windows for future access ;-)
Front door is on and looking good, although I wish we could have had the 1200m size (doesn't fit in the Avoca). I think our frame may need to get replaced though as it has been left out in the rain and is pretty warped. As you can see in the photo below there are some significant gaps either side of the frame but not sure whether this will be covered by a trim?
Internal doors and architraves have been delivered and must be getting installed this week.
Anxiously awaiting a kitchen cupboard delivery!
And by locked out, I mean today was the first time I had to climb through the bathroom window (in a pencil skirt) to get into our build.
For those who are wondering - our doors have been key locked so we can't just undo the latch. I may have strategically opened some windows for future access ;-)
Front door is on and looking good, although I wish we could have had the 1200m size (doesn't fit in the Avoca). I think our frame may need to get replaced though as it has been left out in the rain and is pretty warped. As you can see in the photo below there are some significant gaps either side of the frame but not sure whether this will be covered by a trim?
Internal doors and architraves have been delivered and must be getting installed this week.
Anxiously awaiting a kitchen cupboard delivery!
Subscribe to:
Posts (Atom)